more whiteboard
[Imported from Trac: page Summit2Day1, version 9]
parent
c37930e220
commit
a9b0a213b6
|
@ -58,6 +58,7 @@ expected vs required vs known, k-of-N, H, points, understandability
|
|||
slightly below N (to improve upload availability) and computes and
|
||||
uses a k that maximizes performance (or minimizes cost) while achieving
|
||||
a target reliability.
|
||||
- whiteboard: [grid1](../raw/attachments/Summit2Day1/day1-grid1.jpg), [grid2](../raw/attachments/Summit2Day1/day1-grid2.jpg)
|
||||
|
||||
## encrypted git, or revision control on tahoe
|
||||
- Zack(?) is thinking about revision control on top of Tahoe, will
|
||||
|
|
Loading…
Reference in a new issue