mutable.rst and mut.svg contain some dated or confusing terminology and use different names #1468

Open
opened 2011-08-04 05:49:40 +00:00 by Zancas · 7 comments
Zancas commented 2011-08-04 05:49:40 +00:00
Owner

To make mut.svg (or a variant) use the same naming conventions and contain the complete set of same objects as are found in mutable.rst (at least in the overview section).

To make mut.svg (or a variant) use the same naming conventions and contain the complete set of same objects as are found in mutable.rst (at least in the overview section).
tahoe-lafs added the
documentation
minor
defect
1.8.2
labels 2011-08-04 05:49:40 +00:00
tahoe-lafs added this to the undecided milestone 2011-08-04 05:49:40 +00:00
Zancas commented 2011-08-04 07:01:01 +00:00
Author
Owner

Attachment mutabilityrstZancas20110803.darcs.patch (30560 bytes) added

Clarification of a few points at the beginning of mutable.rst

**Attachment** mutabilityrstZancas20110803.darcs.patch (30560 bytes) added Clarification of a few points at the beginning of mutable.rst
Zancas commented 2011-08-11 04:23:57 +00:00
Author
Owner

Attachment twominortweaks.darcs.patch (28406 bytes) added

**Attachment** twominortweaks.darcs.patch (28406 bytes) added
Zancas commented 2011-08-11 04:28:30 +00:00
Author
Owner

Attachment mut.svg.darcs.patch (298775 bytes) added

**Attachment** mut.svg.darcs.patch (298775 bytes) added
Zancas commented 2011-08-11 04:35:16 +00:00
Author
Owner

Attachment severalchangestomutable.rst.darcs.patch (34042 bytes) added

**Attachment** severalchangestomutable.rst.darcs.patch (34042 bytes) added
Zancas commented 2013-11-13 06:05:20 +00:00
Author
Owner

I say, what do I need to do to close this ticket?

I say, what do I need to do to close this ticket?
daira commented 2013-11-21 20:52:41 +00:00
Author
Owner

It looks like the patches were never reviewed. I suggest converting them to a git branch and submitting a pull request, then adding review-needed here.

It looks like the patches were never reviewed. I suggest converting them to a git branch and submitting a pull request, then adding `review-needed` here.
daira commented 2013-11-21 20:53:42 +00:00
Author
Owner

Btw, the modified lines need to be wrapped.

Btw, the modified lines need to be wrapped.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: tahoe-lafs/trac-2024-07-25#1468
No description provided.